Facilities

STREET LIGHTS Stonebridge has 118 street lights. During 2024, 3 streetlights were converted from High Pressure Sodium to LED, and 5 failed LED bulbs were replaced. Additionally, half of the Lohr Entrance streetlights went out. The electrician diagnosed and repaired the cause of the breaker trips. Total streetlight repair cost for the year was $2575. TENNIS COURTS In July Goddard Coatings performed repairs on the tennis courts and did complete resurfacing and striping. Court #1 now has 2 courts for pickle ball (courts “11 and “12), using portable nets, and it also has 1 tennis court and net. Court #2 has 1 pickle ball court, using the tennis net, and 1 tennis court. The project cost was $24,750 plus $2725 for the portable nets. The court reservation system was upgraded by Joyce Svechota to handle the new configuration. Reservations are now closed for the fall and winter. Marilyn Chong was the driving force behind this project MAPLE RD GATE HOUSE A contract has been signed to replace the cedar shake roof on the Maple Rd Gate House with asphalt shingles. Hopefully the roof can be installed before the weather turns cold. The contractor is a local roofing company and the cost is $6650.